UI MOCKUP - FAIL STATE
← Proposal Pass Demo Fail Demo Reports
Line
Line 7
Shift
Day Shift
Operator
Rajesh K.
Defect Detected!
✗ FAIL
CAM 1 - Top DEFECT
Live Feed - Top Surface
Crack detected
CAM 2 - Bottom OK
Live Feed - Bottom Surface
CAM 3 - Left OK
Live Feed - Left Side
CAM 4 - Right Upper DEFECT
Live Feed - Inside Top
Dry fiber
CAM 5 - Right Center OK
Live Feed - Inside Web
CAM 6 - Right Lower OK
Live Feed - Inside Bottom

Current Product

Product ID PRD-2026-0204-1248
Type C-Channel
Batch BATCH-0204-A
Inspection Time 3.4 sec

Defects Detected (2)

Remove product from line
Crack / Fracture
CAM 1 - Top Surface
CRITICAL
Dry Fiber Exposure
CAM 4 - Inside Top
CRITICAL

Shift Statistics

248
Total Inspected
239
Passed
9
Failed
96.4%
Pass Rate

Confidential & Proprietary - Trinesis Technologies Pvt. Ltd. | Shared exclusively with Sumip Composites Pvt. Ltd. for evaluation purposes only.

Ref: TRIN/PROP/SUMIP/2026-01 | Unauthorized disclosure or reproduction is prohibited.

🔒

Trinesis Technologies

Confidential Proposal